Skip to main content
← All posts

Assignment sales of a pre-construction unit: what to say

By Robert Cekan·November 27, 2026·6 min read
In short

An assignment sale is the sale of a buyer’s rights under a pre-construction agreement, not the sale of a finished unit. Before you list, get the agreement and every amendment, and find out what the builder requires to approve an assignment. The listing should say plainly that it is an assignment, what the seller paid in deposits, and what is still unknown. Tax, builder consent and the assignment agreement itself belong to the seller’s lawyer.

A pre-construction assignment looks like a condo listing until you try to write it. There is no finished unit to photograph, the floor plan is a rendering, the closing date can move, and the seller is passing on a contract rather than a home. Buyers and their agents ask different questions, and a listing that answers them up front gets fewer wasted showings and fewer surprises in the conditions.

Start with the agreement, not the unit

What you can sell is whatever the seller’s agreement with the builder lets them sell. Ask for the full agreement, every amendment and the deposit receipts before you take the listing. Read the assignment clause yourself, then have the seller confirm it with their lawyer.

  • •Does the agreement allow an assignment at all, and does the builder have to consent first?
  • •Does the builder charge an assignment fee, and who pays it?
  • •Does the original buyer stay responsible to the builder after the assignment?
  • •What deposits have been paid, how much is still to come, and when?
  • •What is the current closing or occupancy date, and has it been moved before?
  • •Which unit, floor, exposure and parking or locker does the agreement actually name?

Do not answer these from memory or from what the sales centre said. Write down the answer and where it came from. If the seller does not know, the lawyer or the builder’s sales office can tell them.

Tax is a question for the lawyer and accountant

The Canada Revenue Agency’s GST/HST information sheet on assignments says that, effective May 7, 2022, all assignment sales of newly constructed or substantially renovated residential housing are taxable. It says the total amount payable for the sale of the interest is subject to GST/HST, and that includes a deposit the seller paid to the builder, even when the assignment agreement shows it as a separate line. It also says assignment fees charged by a builder are generally taxable.

That has a direct effect on how you talk about price. A seller who thinks of the price as “what I paid plus a profit” may be surprised by what the assignment is taxed on. You do not calculate or advise on it. Tell the seller early that this needs their lawyer or accountant, and tell buyers’ agents that the assignment agreement will set out the tax treatment. Provincial land transfer tax and any rebate that may apply to the buyer were not something we could confirm for this post, so check with the seller’s lawyer rather than guessing.

What the listing has to say

Say it is an assignment in the first line of the public remarks. A buyer who finds out at the showing request that the unit is an assignment will not thank you, and it is also the fact that changes everything about how they proceed.

Where each fact belongs in the listing
FactWhere to put it
This is an assignment of a pre-construction agreementFirst sentence of the public remarks
Project name, builder, unit type, size from the floor planPublic remarks, with the size labelled as per the builder’s plan
Estimated occupancy or closing datePublic remarks, labelled as estimated, with the date the builder last gave
Deposits paid and still to comePrivate remarks, and the listing’s deposit field if your board has one
Builder consent, fees and approval stepsPrivate remarks and the offer remarks
How and when to view the sales centre, model suite or siteShowing remarks
What to include with an offer and by whenOffer remarks

Describe the unit only as the plans and the builder’s materials describe it. Use words like “per plan” and “estimated”, and do not describe finishes, views or neighbourhood changes that do not exist yet. If a rendering is in the photo set, label it as a rendering. The floor plan post covers how to state measurements without overpromising, and the remarks post has examples for each box.

Showings when there is nothing to show

Many assignments have no suite to walk through. A showing may be a visit to the sales centre, a model suite, or the site, and it may depend on the builder’s hours and rules. Say which in the showing remarks, and check with the builder what access they allow for a resale.

  • •Ask the builder whether you may bring a buyer to the sales centre or model suite.
  • •Put the project’s own brochure, plans and price sheets with the listing, as long as you have the right to share them.
  • •Keep the seller’s contact details out of the public remarks.

Offers and conditions

An offer on an assignment depends on the original agreement, so the conditions are different. Common ones involve the builder’s consent, the buyer’s lawyer reviewing the agreement and its amendments, and financing. The seller’s lawyer should review the offer form and any assignment agreement before the seller signs. Put the review time in the offer remarks, so a buyer’s agent does not submit an offer you cannot act on.

If you are holding offers, the offer night post walks through the day, and the multiple offers post covers comparing offers that have different conditions.

What to leave out

  • •Predictions of what the unit will be worth when it closes.
  • •Rental income projections, unless the seller’s lawyer is comfortable with them.
  • •Statements about what the builder will or will not approve. Report what you were told, and by whom.
  • •Anything about tax treatment beyond “speak to your lawyer or accountant”.

Frequently asked questions

Can a pre-construction buyer sell their unit before it closes?

Only if the agreement with the builder allows an assignment, and many require the builder’s consent and may charge a fee. Read the assignment clause and have the seller’s lawyer confirm it before you list.

Is an assignment sale taxable?

The CRA’s GST/HST information sheet says that, effective May 7, 2022, all assignment sales of newly constructed or substantially renovated residential housing are taxable, on the total amount payable for the sale of the interest. How that applies to your seller is a question for their lawyer or accountant.

Should the listing say it is an assignment?

Yes, in the first sentence of the public remarks. It changes how a buyer has to proceed, and burying it wastes everyone’s time.

What deposit information goes in the listing?

Put the amounts paid and still to come in the private remarks, from the seller’s receipts and agreement, and say who confirmed them.

How Listing Launchpad handles an assignment listing

Listing Launchpad was built so the facts a listing depends on are asked for once, kept in one place, and written into the right box.

  • •The facts only the seller has: mark the deposit, occupancy date and builder details as Ask client, and the seller answers through a private link, with Not sure and a note under each question. Nothing reaches the listing until you approve it, so a guess does not become a statement.
  • •Four boxes, four jobs: the description generator writes the public, private, showing and offer remarks separately, held to the smaller of the Matrix and Realm limits, so the assignment line, the deposit notes and the viewing instructions each land where they belong.

The client portal and the description generator are on every plan, Free included, with the generator within your monthly AI copy generations.

About the author

Robert Cekan is a REALTOR® in Hamilton, Ontario, the publisher of Urbanicity Hamilton, and the founder of Listing Launchpad. The playbooks here come from running real listings.

Related
The client portal What to put in MLS private, showing and offer remarks Floor plans and room measurements
Try Listing Launchpad free